the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,792
photos
21,321
posts
spanning
November 2023 – August 2026
latest
August 3, 2026
More filters ↓
Project
refurbishment of Jurassic Park River Adventure 25 demolition of the Sinbad theater 20 Lost Continent demolition 15 Sinbad theater demolition 13 refurbishment 11 Poseidon's Fury demolition 10 Eighth Voyage of Sindbad Stunt Show theater demolition 6 VelociCoaster 6
+40 more

Jump to a month

December 22, 2025 6:31 PM

Aerial photo of the refurbishment of the bridge between Lost Continent and Seuss Landing. Wood planks recently added. At left is the remaining section of a temporary steel deck.

December 19, 2025 4:35 PM

Trusses in Islands of Adventure. Possibly are start of staging for nightly entertainment during the Christmas-New Years holiday weeks.

December 19, 2025 4:32 PM

DJ stage and dancer platforms added to Islands of Adventure. Possibly for the Christmas-New Years holiday weeks.

December 19, 2025 4:28 PM

Details of the wood deck being added to the bridge between Lost Continent and Seuss Landing. Replacing temporary steel sheeting placed when stages of the refurbishment reopened to guests.

December 13, 2025 1:11 AM

Aerial photo of bridge refurbishment, between Lost Continent and Seuss Landing. New railings nearly complete on the lagoon side (left side in this viewpoint).

November 26, 2025 8:07 PM

Aerial photo of part of Lost Continent. Entrance of the former Poseidon's Fury.

November 26, 2025 8:05 PM

Aerial photo of where trees were recently removed in Lost Continent.

November 26, 2025 8:03 PM

Aerial photo of Orlando Fire Dept trucks parked behind Lost Continent. Likely for a safety inspection. Trucks ready to leave immediately if an emergency response is needed in the City.

November 26, 2025 7:59 PM

Aerial look at the bridge refurbishment between Lost Continent and Seuss Landing. Scaffolding and scrims on one side, where railing work continues. The bridge deck character changed from planks secured with rivets, to what may be theming as weathered and worn.

Older → ↩ Back to the newest