the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026
More filters ↓

Jump to a month

November 14, 2025 2:03 AM

Current state of a new wall in CityWalk. Forms removed from the section at left, concrete still curing. Walkway will shift near the wall, expanding the roller coaster construction site.

November 9, 2025 9:33 PM

Current view of where a walkway is being redone in CityWalk. Path at left was originally a crossover between upper and lower walkways. Lower walkway had stairs, and will become a gentle slope.

November 8, 2025 3:11 AM

Aerial photo of roller coaster footers in development near CityWalk. Concrete being poured for a sheet foundation.

November 8, 2025 3:01 AM

Ground level and aerial photos of the latest section of concrete forms for a wall in CityWalk. Recently poured concrete can be seen in the aerial photo.

November 8, 2025 2:51 AM

Aerial look at construction at CityWalk. Related to a new roller coaster in Universal Studios Florida.

November 8, 2025 12:21 AM

xfinity marketing in CityWalk, featuring Frankenstein's Monster.

November 7, 2025 1:26 AM

Billboard up in CityWalk for the return of Green and Red Coconut Club.

November 6, 2025 1:48 AM

A recently-cast concrete wall in CityWalk. Part of the redo of a guest path near roller coaster construction in Universal Studios Florida.

November 4, 2025 1:08 AM

Dark message boards in the CityWalk pedestrian bridge.

November 1, 2025 12:56 AM

Concrete form for a column added at work for a new waterfront wall in CityWalk. Arrow at location of the next column in the series.

October 31, 2025 12:45 AM

Arrow at a concrete form staged for a cylindrical column. Perhaps to be matching style of the column seen at right. At the CityWalk waterfront.

October 31, 2025 12:40 AM

Current work on concrete forms for a new curved wall in the CityWalk waterfront.

Older → ↩ Back to the newest