the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,816
photos
21,341
posts
spanning
November 2023 – August 2026
latest
August 5, 2026
More filters ↓

Jump to a month

November 2, 2025 1:23 AM

Quick photo of the popular and almost always in use EPCOT five ring logo table in Connections Cafe.

November 2, 2025 1:12 AM

DVC marketing in Polynesian Resort. A large door display, where the knob periodically animates. As if indicating, "touch me to open the door". Instead, guests should touch the display at the side. Select a DVC resort by name, and door opens to showcase that resort.

November 2, 2025 12:46 AM

Polynesian Resort Tiki character shirt. (Seems like this would be better seen on a darker shirt color.)

November 2, 2025 12:41 AM

Unusual inconsistency in sign styles at Polynesian, with the addition of the Island Tower (DVC) directions.

November 2, 2025 12:20 AM

Monorail view of Magic Kingdom construction staging areas, and Oct 12 aerial photo. Berm likely to have trees and shrubs. Many decades plan could be marina and parade buildings shift West. Marina docks in pond, with canal access. Service area replaced by attractions.

October 28, 2025 1:21 AM

The Incredible Hulk and Dr Doom's Fearfall behind Port of Entry at night.

October 28, 2025 1:13 AM

Crescent Moon through clouds behind the fishing angel above Port of Entry.

October 26, 2025 11:40 PM edited

A story in the exterior of Mythos Restaurant is Narcissus gazing at his own reflection in a pool. One of the topics discussed in the latest article by Entertainment Writer @derekburgan https://touringplans.com/blog/theme-park-enjoyment-index-for-october-2025-not-so-scary-hhn-epcot-trash-can-stickers-and-more/

Older → ↩ Back to the newest