the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,826
photos
21,350
posts
spanning
November 2023 – August 2026
latest
August 6, 2026
More filters ↓

Jump to a month

September 20, 2025 12:53 AM

Bays in the former maintenance building of Hollywood Rip Ride Rockit.

September 20, 2025 12:51 AM

Opposing views of Hollywood Rip Ride Rockit track that used to run along the station and out to CityWalk.

September 20, 2025 12:47 AM

At right, track that used to run along the Hollywood Rip Ride Rockit station to CityWalk. At left, part of the former maintenance building.

September 19, 2025 10:31 AM

Conjunction of The Moon, Venus, and a bright star named Regulus. With the demolition of Hollywood Rip Ride Rockit.

September 19, 2025 12:28 AM

Photo yesterday of a #HHN access to the soundstage houses. Hollywood Rip Ride Rockit demolition is reaching this area. Track out of frame at right was removed today.

September 19, 2025 12:22 AM

Current view of a demolition area of Hollywood Rip Ride Rockit. Doors open in the construction fence for #HHN event nights. One of the routes to access the soundstage houses.

September 19, 2025 12:05 AM

Demolition has started inside the former Hollywood Rip Ride Rockit station. • Access stairs and part of the load platform removed at left. • Track removed at right, with walls partially removed at the service bay.

September 18, 2025 11:58 PM

Demolition underway at the former maintenance bay of Hollywood Rip Ride Rockit.

September 18, 2025 11:51 PM

Demolition underway at the former station of Hollywood Rip Ride Rockit. Walls being removed at the maintenance bay. Arrows at rails that were used for trains in the bay.

September 18, 2025 11:44 PM

Arrow where a section of track has been cut and removed from the former Hollywood Rip Ride Rockit station.

September 18, 2025 11:39 PM

Demolition underway in the station of Hollywood Rip Ride Rockit. Including a section of track removed on the CityWalk end.

September 18, 2025 12:55 AM

Sand seen inside cut rails of the demolition of Hollywood Rip Ride Rockit. Sand reduces ride vehicle vibration. Also reduces noise.

Older → ↩ Back to the newest