Arrows at connectors for the track of the Hollywood Rip Ride Rockit service elevator.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
More filters ↓ Fewer filters ↑
+31 more Fewer
+35 more Fewer
Jump to a month
Show every monthService elevator of the Hollywood Rip Ride Rockit tower.
Detail of the tower of Hollywood Rip Ride Rockit to note while it is still intact. A service ladder is divided into segments, with a walk on a platform to another segment. As opposed to one long ladder, top to bottom.
Current demolition of Hollywood Rip Ride Rockit. Highest brake run was removed early this morning.
Optimus Prime points to where the highest brake run was removed early this morning at Hollywood Rip Ride Rockit.
Latest cut in the demolition of Hollywood Rip Ride Rockit. Highest brake run platform removed.
A DreamWorks Animation team shirt.
A Team Member shirt from the construction of Islands of Adventure. Celebrating the success of Pteranodon Flyers as the first operating attraction.
Some of the crow theming of the Halloween Market recently introduced to CityWalk. Multiple bird figures in top right.
Crow-themed Halloween Market recently introduced to CityWalk.
Current demolition of Hollywood Rip Ride Rockit. Track after a brake run was removed early this morning.
Current demolition of Hollywood Rip Ride Rockit.
Latest cut in the Hollywood Rip Ride Rockit track. At the former Treble Clef side of a brake run.
There's lanyard available for #HHN guests to indicate "no scares, please". $20. The medallion glows red. Sections of the fabric have red lights too. For scare zones only. A service dog was wearing one Saturday. Ask for it at a sales counter, such as in the primary gift shop.
Crow takeover of Hollywood Rip Ride Rockit.