the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,816
photos
21,341
posts
spanning
November 2023 – August 2026
latest
August 5, 2026
More filters ↓

Jump to a month

August 21, 2025 11:36 PM

Aerial photo of the demolition of the Treble Clef element of Hollywood Rip Ride Rockit.

August 17, 2025 7:29 AM

Aerial photo of Polynesian Resort and work on the new entrance road. Arrow at a lane closure in Floridian Way.

August 17, 2025 7:25 AM

Aerial photo of work on the new entrance to Polynesian Resort. Arrow at a lane closure in Floridian Way. 📷August 16

August 17, 2025 7:14 AM

Aerial look at EPCOT and Disney's Hollywood Studios from 3100 ft.

August 17, 2025 2:34 AM

Aerial look at exterior models and pavement tests near the Imagineering office at Animal Kingdom. An unusual test is at the arrow.

August 17, 2025 2:30 AM

A nearly straight-down aerial look at exterior models and pavement tests near the Imagineering office at Animal Kingdom. 1 Sculpting studio. Where masonry and stone facades are created. Paint is pending for these models. 2 Flagstone pavement test in progress.

August 17, 2025 2:18 AM

Aerial photos of where a berm and part of a retaining wall have been removed at the Encanto ride site in Disney's Animal Kingdom.

Older → ↩ Back to the newest