Aerial photos of work at the I-4 interchange with SR 525 S Apopka-Vineland Rd.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+21 more Fewer
Jump to a month
Aerial photo of site prep for I-4 express lanes through the SR 528 Beachline interchange.
Two of the high-mounted cameras monitoring traffic flow at the redo of the I-4 interchange with Sand Lake Rd.
Sidewalk views under the new I-4 WB lanes at Sand Lake Rd. Retention wall and old overpass for I-4 WB will be demolished after traffic switches to the new overpass. This switch happening soon.
A look at construction of a cloverleaf ramp that will replace the left turn of Sand Lake Rd WB to Turkey Lake Rd SB.
Aerial photo of construction staging areas in progress West of Magic Kingdom.
Aerial look back to Jul 12 in the Encanto attraction site. Compare to Jul 26 photo in first Post of this Thread.
Aerial look at demolition in the former Muppets Courtyard, and concept art for Monsters Inc theming.
Aerial look at demolition in the former Muppets Courtyard.
At center of this aerial is the perimeter service road of Disney's Hollywood Studios. At left, site preparation for the Monsters Inc roller coaster show building.
Aerial photos of site clearing for the Monsters Inc roller coaster show building.
Aerial photo of site clearing for the Monsters Inc roller coaster show building.
Aerial photo of site clearing for the Monsters Inc roller coaster show building (or gravity building).
Aerial overview of the development of Catchlight Crossings. Universal's partnership for affordable housing near Epic Universe.
Aerial photos of current work in the redo of the I-4 interchange with Sand Lake Rd. Seems like I-4 WB will shift to the new overpass soon.