the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,810
photos
21,336
posts
spanning
November 2023 – August 2026
latest
August 4, 2026
More filters ↓
Project
Villains land 101 Piston Peak 65 Fast & Furious: Hollywood Drift 53 Tropical Americas 33 Monsters Inc. land 15 Hollywood Rip Ride Rockit replacement 12 Lost Continent demolition 12 Luke Combs' Category 10 12
+40 more

Jump to a month

July 11, 2025 12:46 AM

A flagpole was lowered, and landscaping removed, where a sloping walkway will replace stairs in CityWalk.

July 11, 2025 12:40 AM

A dirt bank is increasing in size in CityWalk. There might be a large excavation in background. Possibly for construction of sheet foundations for roller coaster track supports.

July 11, 2025 12:35 AM

A look at the construction site in CityWalk, where a site is being prepared for the attraction that replaces Hollywood Rip Ride Rockit. • Landscaping removed in foreground. • One flag pole is down. • Dirt bank continues to build in background.

July 10, 2025 12:45 AM

Current site work next to Hollywood Rip Ride Rockit. Former Blue Man Group signs removed.

July 9, 2025 12:29 AM

Former Blue Man Group signs in a site next to Hollywood Rip Ride Rockit. A few more trees also removed as part of the site prep for a new attraction.

July 8, 2025 12:21 AM

Current site preparation near CityWalk for the attraction that replaces Hollywood Rip Ride Rockit.

July 3, 2025 9:01 PM

Kirkman Rd sidewalk, North of the Helios Grand Hotel entrance, is still in development. Construction team seen working today in one of the tunnels that eliminate crosswalks.

July 3, 2025 8:50 PM

Sidewalk along the raised traffic circle, near the Stella Nova entrance. As seen today, and on March 25 when the area at right was still a construction staging area.

July 3, 2025 7:51 PM

Additional dirt staged as part of the site preparation for the attraction replacing Hollywood Rip Ride Rockit. Arrow at one of the former signs for the Blue Man Group show. Large hole.

July 3, 2025 7:44 PM

Additional dirt staged as part of the site preparation for the attraction replacing Hollywood Rip Ride Rockit. At top center, concrete is being pumped at a project on the other side of these buildings.

July 2, 2025 11:40 AM

Sometimes multicam stops working... "WHAT did I do???" Make sure the multicam track has the blue selection (V1 seen here). Do not lock any track in the timeline view. 12 collapsed tracks seen here in timeline. 2 additional short clips added on top the multicam track.

June 29, 2025 11:02 PM

Aerial photos of the remaining dirt bank in center of Magic Kingdom parking. Sand excavated to create the retention pond at top center was piled in the center of the parking lot. Over the years, the sand was trucked over to Floridian Way projects. Ramps, overpasses, widening.

June 29, 2025 10:53 PM

Aerial photo of construction recently started on a new entrance road at Polynesian Resort. Connecting to the wider Floridian Way in progress.

Older → ↩ Back to the newest