Bicycle parking at Epic Universe. Near the Stella Nova crosswalk at Epic Blvd. Mario Kart show building in distance.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
More filters ↓ Fewer filters ↑
+30 more Fewer
+17 more Fewer
Jump to a month
Show every monthKirkman Rd sidewalk, North of the Helios Grand Hotel entrance, is still in development. Construction team seen working today in one of the tunnels that eliminate crosswalks.
There are often areas in construction where work is finished, but incomplete. These issues go into a so-called punch list. Amusing to see this incompletely painted area at the raised traffic circle near Epic Universe. The traffic circle concrete was painted in Feb. Except here!
Sidewalk along the raised traffic circle, near the Stella Nova entrance. As seen today, and on March 25 when the area at right was still a construction staging area.
Flooded walkway at the raised traffic circle near Epic Universe. This walkway the only one available to • Terra Luna guests • Guests in lodging along Universal Blvd, such as Vista Cay and EVEN/Staybridge • The Orange County Convention Center area
How close a Hemisphere Dancer pontoon is to the Lone Palm Airport Bar in CityWalk.
Current work in a redo of a CityWalk walkway. Stairs to be replaced with a slight hill.
Additional dirt staged as part of the site preparation for the attraction replacing Hollywood Rip Ride Rockit. Arrow at one of the former signs for the Blue Man Group show. Large hole.
Additional dirt staged as part of the site preparation for the attraction replacing Hollywood Rip Ride Rockit. At top center, concrete is being pumped at a project on the other side of these buildings.
Sometimes multicam stops working... "WHAT did I do???" Make sure the multicam track has the blue selection (V1 seen here). Do not lock any track in the timeline view. 12 collapsed tracks seen here in timeline. 2 additional short clips added on top the multicam track.
Music and lighting recently added along a CityWalk walkway that is lined with construction fencing.
Walkway removal in CityWalk. Related to site preparation for a new attraction replacing Hollywood Rip Ride Rockit.