the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,810
photos
21,336
posts
spanning
November 2023 – August 2026
latest
August 4, 2026
More filters ↓
Project
Villains land 101 Piston Peak 65 Fast & Furious: Hollywood Drift 53 Tropical Americas 33 Monsters Inc. land 15 Hollywood Rip Ride Rockit replacement 12 Lost Continent demolition 12 Luke Combs' Category 10 12
+40 more

Jump to a month

June 28, 2025 4:38 PM

Aerial photos of construction for an Encanto attraction in Disney's Animal Kingdom. Part of the Tropical Americas project.

June 28, 2025 4:26 PM

Aerial photos of recent land clearing West of Magic Kingdom. At center is new routing in progress for Floridian Way.

June 28, 2025 4:24 PM

Aerial photos of construction staging in development, and an excavation. West of Magic Kingdom.

June 28, 2025 4:21 PM

Aerial photo of construction staging areas in development West of Magic Kingdom.

June 28, 2025 4:18 PM

Aerial photo of Rivers of America at left, and construction staging areas in development at right.

June 28, 2025 4:15 PM

Aerial look at land clearing for a construction staging area West of Magic Kingdom. At top is canal staging of Electrical Water Pageant. Magic Kingdom monorail beams seen at top right.

June 28, 2025 4:13 PM

Aerial photo of preparation for a construction staging area West of Magic Kingdom. At left is canal staging of Electrical Water Pageant. Yellow mats at bottom right help to keep dirt out of Floridian Way.

June 28, 2025 4:09 PM

Aerial look at land clearing for construction staging areas West of Magic Kingdom.

June 28, 2025 4:05 PM

Aerial photo of land clearing West of Magic Kingdom. At center to top right is also work for a new routing of Floridian Way.

June 28, 2025 4:03 PM

Aerial overview of land clearing West of Magic Kingdom. At top left to center is also work for a new routing of Floridian Way.

June 27, 2025 9:51 PM

Current site prep for the attraction replacing Hollywood Rip Ride Rockit. Utility conduits, walkways, and most landscaping removed. Dirt appears to be contoured/graded for the project. Similar prep to be done at right, after the roller coaster closes.

June 22, 2025 12:54 PM

A comically misaligned door at the Hemisphere Stage has same theming as a construction fence at an Epic Universe expansion pad (behind the gate, 2nd photo).

Older → ↩ Back to the newest