Construction fence at the West end of Hollywood Rip Ride Rockit.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,833
- photos
- 21,355
- posts
- spanning
- November 2023 – August 2026
- latest
- August 7, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
You are welcome to save out these portrait photos of Chronos for personal use as mobile device wallpaper.
Wing installation in progress on Hemisphere Dancer in CityWalk.
Gooftastic Summer theming at CommuniCore Hall.
Former location of the Forces of Nature by AntiGravity show in EPCOT.
A concrete truck making a delivery to an outer most walkway section of the Beach Club/Yacht Club pool refurbishment.
Lighting recently turned on at one side of the covered parking in Epic Universe.
Tree theming under a bridge in The Isle of Berk. Compare to aerial photo in first Post in this Thread.
Odd work in progress at the Stardust Racers queue roof. (Or a so-called punch list item. An incomplete construction issue.)
A look at a service road crossing from the queue of Stardust Racers.
Stardust Racers seen from the queue at the service road crossing.
Stardust Racers queue reached the halfway in the S-curve yesterday. Gates seen in the Mar 1, 2025 aerial photo have been removed. Perhaps for airflow in the queue.
Chronos and Luna seen during the Epic Universe closing show.
Chronos and Luna seen during the Epic Universe closing show.
Similar but different. Starbursts in Celestial Park, and starbursts in the recently opened GEO-82 lounge in EPCOT.