Theming in the Curse of the Werewolf station.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
Jump to a month
The Dark Universe bell at night. The Burning Blade Tavern bursts into flame about a minute after this bell rings.
Comet theming inside the Stardust Racers station.
Empty courtroom queue at Battle at the Ministry. Seen by the last guests to experience the attraction last night, from the exit routing.
Empty courtroom queue seen by the last guests to experience Battle at the Ministry last night. Guests arrive in London by Metrofloo here.
A look back at the Battle at the Ministry entrance. From the ride queue, after park closing. A common thing in theme parks is if you are in line for an attraction (or are dining) at the park closing time, you have opportunity for the full experience.
Some of the ceiling trim in the Delores Umbridge office.
A lot of details to notice in the Delores Umbridge office. Such as the pair of shoes. One dangling from the elf foot.
Small detail to notice. One of the talking portraits is on loan (or maybe fell out of favor), with dirt outline at that space. In the courtroom queue for Battle at the Ministry.
A small detail to notice in the courtroom queue for Battle at the Ministry. An open window in the talking portraits room opens to a corridor seen from the next room.
Masonry theming in the extended queue for the Metrofloo to Battle at the Ministry.
Weathered theming at the extended queue for the Metrofloo to Battle at the Ministry.
Inside the extended queue for the Metrofloo to Battle at the Ministry. Area near the pole seen at center has about 2 hours remaining to ride the attraction. A queue for the courtroom (in London, according to story) is after this queue.
Construction fences down at Prime parking in Epic Universe. Electrical work in progress, including for the under roof lighting.
A portable chilled water cooler has been in the CityWalk escalator area Mens restroom. First photo today, where recently the water supply and return are routed in the ceiling. Second photo Apr 23 where at first the tubing for the cooler was at sinks. Air is near 100% humidity.