Aerial photos of work for a new ramp and exit at I-4 and SR 535 Apopka-Vineland Rd
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,816
- photos
- 21,341
- posts
- spanning
- November 2023 – August 2026
- latest
- August 5, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+37 more Fewer
Jump to a month
Aerial photos of the I-4 interchange with Central Florida Pwy (the SeaWorld Orlando interchange).
Aerial photos of current work at the SR 538 Beachline interchange with I-4. The ramp from I-4 WB to SR 538 is being widened to two lanes.
Aerial photo of the redo of the Sand Lake Rd interchange with I-4. I-4 WB Diverging diamond exit will soon shift. Eventually the left turn from Sand Lake WB to Turkey Lake SB becomes cloverleaf style ramp, merging with an I-4 WB ramp for Turkey Lake SB.
Aerial photo of current work in the redo of the Sand Lake Rd interchange with I-4.
Arrow in this aerial photo at a temporary cable crossing in Celestial Park. At left there is electrical work in progress at a pair of restaurants in development.
Aerial overview of current construction of the Sand Lake Rd interchange with Kirkman Rd. Arrow at development a tunnel, so that pedestrians don't need a crosswalk to travel along Kirkman.
A nearly straight-down aerial look at the tallest sections of Stardust Racers.
Aerial overviews of work in the fireworks launch site of Epic Universe.
Aerial look at utility work in progress through the fireworks launch site for Epic Universe.
At center of this aerial photo are recently added Imagineering offices for coordinating construction in Animal Kingdom.
Aerial overview of the Muppets Courtyard area in Disney's Hollywood Studios. To be changed to a Monsters Inc area, with a new show building in part of the Cast Member parking lot.
Monsters Unchained show building at side of the Helios Grand Hotel pool. (Building not very noticeable when there, because the seating is directed toward the pool and hotel tower.)
You might see these heat expansion joints in hallways of Helios Grand Hotel. The building is structurally 3 different towers next to each other. These joints are between the towers. Aerial photo Aug 18, 2023.
Construction continuing at The Blue Dragon in Epic Universe. As seen overnight from Helios Grand Hotel.