Stardust Racers entrance at night.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,869
- photos
- 21,379
- posts
- spanning
- November 2023 – August 2026
- latest
- August 8, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Construction never stops in Epic Universe. Seen at center is scaffolding rising at Atlantic. In background is railing installation. 90 minutes after the park had closed for the day.
Construction never stops in Epic Universe. Seen at center is scaffolding rising at Atlantic, 90 minutes after the park had closed for the day.
Current work at a shop refurbishment near the entrance of Universal Studios Florida. New glass added overnight at the shop entrance.
A portable chilled water cooler has been in the CityWalk escalator area Mens restroom. First photo today, where recently the water supply and return are routed in the ceiling. Second photo Apr 23 where at first the tubing for the cooler was at sinks. Air is near 100% humidity.
What happens to the Epic Universe Preview Center in nine days? Will video message change to a daily count: ... grand opening in 8 days ... 7 days ... 6 days ...
Areas of Celestial Park where decoration is pending. At kiosks near the Cosmos Fountain.
Flying memos in Battle at the Ministry.
Easily overlooked in The Battle at the Ministry is the large statues in the lobby are on a raised platform.
Battle at the Ministry sometimes bypasses the office of Delores Umbridge.
Inside Das Stakehaus restaurant in Dark Universe.
Monsters mounted inside The Burning Blade Tavern.
Werewolf tracks in Dark Universe.
Heavily cracked floor in the queue of Monsters Unchained: The Frankenstein Experiment.
Emergency exit sign theming in the queue of Monsters Unchained: The Frankenstein Experiment.