Center of the Astronomica splash pad.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,869
- photos
- 21,379
- posts
- spanning
- November 2023 – August 2026
- latest
- August 8, 2026
More filters ↓ Fewer filters ↑
+40 more Fewer
+40 more Fewer
Jump to a month
Seems like The Blue Dragon Restaurant will open soon. Culinary Team seen inside.
Pool partially-filled yesterday at the Cosmos Fountain. No fountain jets.
Pavement lighting in Celestial Park.
Some of the Celestial Park lighting.
Reflection of Epic Universe in Atlantic restaurant.
Small change at the Luna Overlook due to construction. Barricades moved outward, closing off a small path reaching an island.
Club Jupiter sign recently added above an entrance to this VIP room in Epic Universe. Seems like work in progress.
Construction continues at Epic Universe. Including a door added to a likely gift shop in the transportation plaza.
A subtle design in Epic Universe parking is the poles have graphics that match color of the signs of that section.
Celestial figures at sides of Chronos. Believed to be named Dusk and Dawn.
One of Luna's flames seen together with the sphere at top of the portal ring of Chronos.
Luna and the Moon Rabbit at night.
Painting continues at the refurbishment of a shop at front of Universal Studios Florida. Blue added to the half-round style moldings along the roofline.
Metrofloo for giant wizards (such as Hagrid). Compare to door at left.