Aerial photo of Stella Nova and Terra Luna resorts. Arrow at a Universal marquee in progress. As of today, Kirkman Rd still closed here. Universal Blvd single lanes both directions, as repaving continues after utility work. Bus only lane entrances/exits recently brightly painted.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
More filters ↓ Fewer filters ↑
Jump to a month
Show every monthAerial look at the raised traffic circle near Epic Universe. Bright paint recently added to the bus only lanes at center.
Aerial photo of the statue of Luna in front of Epic Universe, with nearby work in progress.
Aerial look at current work at the cascading water feature and gardens of Luna Overlook.
Aerial look at Team Member training and construction teams at front of Epic Universe.
Aerial photo of theming details of Chronos. Including the recent addition of Pegasus.
Aerial photo of work at Chronos in Epic Universe.
Aerial look at work in progress at Chronos. The overall portal into Epic Universe.
If you zoom into this aerial photo you will see a variety of activity. Including Team Member training, windmill removed from the Isle of Berk, and multiple projects in the Chronos area.
Aerial overview of the Epic Universe entrance plaza.
View of floating solar panels from Terra Luna resort. At top center is Dr Doom's Fearfall.
Aerial look at floating solar panels near Epic Universe. Can you spot the worker seen in first photo of this Thread?
Aerial look at floating solar panels near Epic Universe.
Aerial photo of landscaping teams and pressure washing teams near Stardust Racers and Meteor Astropub.
Aerial look at electrical work in progress near the Stardust Racers entrance. Also, a landscaping team is working at right.