Aerial look at a pair of restaurants in Celestial Park.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
Jump to a month
Show every monthAerial photo of colorful pavement patterns outside a pair of restaurants in Celestial Park.
Aerial photo of current work at the pond adjacent to Constellation Carousel.
Aerial photo of colorful pavement patterns between Constellation Carousel and the Super Nintendo World portal.
Aerial photo of the colorful pavement patterns outside of Constellation Carousel.
Aerial photo of the entrance of Constellation Carousel. In background are colors of the decorative windows, cast on the ground by sunlight.
Aerial overview of Constellation Carousel.
A look at the concept model of the Oak & Star Tavern entrance. Compare to work so far in the first Post of this Thread.
Aerial photo of theming at Oak & Star Tavern.
Aerial photo of theming in progress for restrooms between the Super Nintendo store and Pizza Moon.
Aerial look at construction near the Celestial Park bandshell.
Aerial photo of a Concierge outside of the portal of Dark Universe. Themed graphics on the barriers are of the five portals of Epic Universe.
Aerial look at construction at the Epic Universe show fountain. There's a change to operating theme park, as indicated by green fences designating a work site. Also lines of barriers with themed coverings.
Aerial overview of the Epic Universe show fountain. Additional elements are being added around the basin edge. Green walls indicate a change to operating theme park with fenced construction sites.
Aerial photo of areas outside the portal of The Wizarding World of Harry Potter - Ministry of Magic.