Aerial photo of current work on the park side of Chronos in Epic Universe.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
Jump to a month
Show every monthAerial photo of work at the entrance of Epic Universe. Railings are staged at right for a staircase to a 2nd floor VIP room.
Aerial photo of current work on Chronos.
Aerial look at fountains in a pond near Atlantic restaurant.
Aerial look at the front of Epic Universe.
Feb 1 aerial photo of work on the plaza at front of Atlantic restaurant in Epic Universe.
Aerial photo of development of the cascading water feature in front of Epic Universe. At top right is the underground kitchen of Atlantic restaurant. Seems like more dirt will be placed here soon. Walkway to Super Nintendo World is under the arcade at top of this photo.
Aerial photo of walkways and the cascading water feature in development at front of Epic Universe.
Aerial photo of development of the cascading water feature at front of Epic Universe.
Aerial overview of Luna Overlook at front of Epic Universe.
Aerial photo of Luna Overlook.
Aerial photo of Luna Overlook. Chronos is stopped in a non-level position, at left.
Aerial photo of Luna at front of Epic Universe.
Aerial photo of Luna in Celestial Park.
Aerial photo of Luna in Celestial Park.