the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026

822 photos in January 2025

Clear all Grid Feed

Jump to a month

Show every month
January 25, 2025 3:30 PM

Aerial photo of the front of Stardust Racers at night.

January 25, 2025 3:27 PM

Aerial photo of Stardust Racers at night. A recent addition is the tall rectangular tent over the marquee. Perhaps to shield work in progress from recent rain and cold.

January 25, 2025 2:48 PM

Magic Kingdom area at sunset. Contemporary Resort at left. At right are Space Mountain and the crane at refurbishment of Big Thunder Mountain Railroad.

January 25, 2025 1:24 PM

Aerial look at the portal to The Isle of Berk, at night.

January 25, 2025 1:17 PM

Aerial look at the portal of The Wizarding World of Harry Potter - Ministry of Magic at night. The inscription was recently added.

January 25, 2025 1:11 PM

Aerial look at the portal to Dark Universe at night.

January 25, 2025 1:07 PM

Aerial look at the portal of Super Nintendo World at night.

January 24, 2025 3:03 AM

Dec 9, 2022 aerial photo pf construction at Stella Nova resort. At center is what we now know as the 3rd floor hallway with stars. The Star Bridge. See first Post of this Thread.

January 24, 2025 3:03 AM

Semicircle with windows at the lobby ceiling of Stella Nova. This semicircle also seen in first Post of this Thread.

January 24, 2025 3:02 AM

Jan 23, 2023 aerial photo of construction at Stella Nova resort. Note the semicircle at the lobby (center of this photo).

January 24, 2025 3:02 AM

Rotating air lock door of Stella Nova resort.

January 24, 2025 3:01 AM

The bar in Stella Nova resort.

January 24, 2025 3:01 AM

A lounge area of the Stella Nova bar.

January 24, 2025 3:01 AM

Sound baffling ceiling above the main dining room of Stella Nova. Most lobby areas are solid curved ceiling.

January 24, 2025 3:01 AM

The primary dining room of Stella Nova resort. Orders are placed at with Team Members at counters off camera at left. Guests receive a pager and choose their table. Pager announces when meal is ready at the pick-up window.

Older → ↩ Back to the newest