Aerial photo of the most active areas of construction of Disney Lakeshore Lodge.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,810
- photos
- 21,336
- posts
- spanning
- November 2023 – August 2026
- latest
- August 4, 2026
Jump to a month
Show every monthArrows in this aerial photo where wings are in development for Disney Lakeshore Lodge.
Aerial overview of current construction of Disney Lakeshore Lodge. A DVC resort next to Ft Wilderness.
Aerial photo of the Polynesian and Grand Floridian resort areas. Running along the golf course greens and forest is construction for the new route of Floridian Way.
Aerial look at Floridian Way construction. Widening near Polynesian Resort, and rerouting west of Grand Floridian Resort.
Aerial look at Floridian Way construction near Polynesian Resort. At right is the entrance road for Shades of Green.
Aerial look at Floridian Way construction near Polynesian Resort. At right is the entrance road for Shades of Green.
Aerial look at where a bridge is under construction for the new routing of Floridian Way.
Aerial look at land cleared for the new routing of Floridian Way.
Aerial look at the rerouting of Floridian Way. West of Grand Floridian.
Aerial overview of the rerouting of Floridian Way. West of Grand Floridian.
Aerial photo of the rerouting of Floridian Way. West of Grand Floridian.
Aerial look at the redo of the intersection of Floridian Way and Seven Seas Drive.
Aerial look at the redo of the intersection of Floridian Way and Seven Seas Drive, near Polynesian Resort. At left, the entrance of Shades of Green.
Aerial overview of the Polynesian Resort area, including work rerouting Floridian Way.