the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026

884 photos in December 2024

Clear all Grid Feed

Jump to a month

Show every month
December 28, 2024 10:00 PM

Part of the ceiling design in the new Island Tower lobby at Polynesian Resort.

December 28, 2024 9:58 PM

Floor to ceiling art in the new Island Tower lobby at Polynesian Resort.

December 28, 2024 9:52 PM

Artwork hanging in the new Island Tower lobby at Polynesian Resort.

December 28, 2024 9:47 PM

Some of the design features of the porte-cochère at the new Island Tower in Polynesian Resort.

December 28, 2024 9:43 PM

A waiting area at the porte-cochère of the new Island Tower of Polynesian Resort.

December 28, 2024 9:41 PM

A direction sign at base of the new Island Tower in Polynesian Resort. The design on the pot ties to a lobby design.

December 28, 2024 9:38 PM

Fence along the reopened route between Grand Floridian and Polynesian Resort. The wood will weather naturally with character.

December 28, 2024 9:35 PM

A look at the Island Tower from the reopened route between Grand Floridian and Polynesian Resort.

December 28, 2024 9:29 PM

A path is starting to be worn into this lawn. DVC guests at Grand Floridian taking a logical route between their building lobby and the new DVC Island Tower at Polynesian Resort.

December 28, 2024 9:25 PM

Very likely that stairs will soon be added on this artificial grass slope at the newly-added Island Tower in Polynesian Resort. DVC Grand Floridian guests go down this slope to return to their lodging. Likely to be slippery when wet. Stairs added for guest safety.

December 28, 2024 9:19 PM

Some of the leisure areas outside the Island Tower in Polynesian Resort.

December 28, 2024 9:16 PM

The recently opened Island Tower in Polynesian Resort.

December 28, 2024 9:14 PM

An aerial look back to the Polynesian Banyan tree about to be relocated. At center of the Oct 28, 2022 photo. And the tree in its new location. Nov 12, 2022.

December 28, 2024 9:11 PM

This Banyan tree has been behind a construction fence for a few years at Polynesian resort. Originally located next to the resort's Luau, and transplanted here. Preparation for construction of the Island Tower. Tree currently starting new leaves for the new season.

December 28, 2024 2:11 AM

Guest Christmas lights and decorations in Aventura Hotel. • A suite window has lights arranged like The Grinch, and two trees seen in the adjacent windows. • A standard room below has scrolling words in the window, Merry Christmas.

Older → ↩ Back to the newest