Aerial photo of Celestial Park features at base of Helios Grand Hotel.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
Jump to a month
Show every monthAerial photo of the cascading water feature at the Celestial Park side of Helios Grand Hotel. Flows into the Epic Universe show fountain.
Aerial photo of the cascading water feature at the Celestial Park side of Helios Grand Hotel. A statue of Helios is in development at the scaffolding.
A nearly-straight down aerial look at development of a statue of Helios in Epic Universe. A bird is part of the sculpture.
Aerial photo of the statue of Helios in Epic Universe. Currently in scaffolding. Zoom in to see Helios Grand Hotel details, like the chandelier in the lobby.
Aerial photo looking across development of the Epic Universe show fountain to the statue of Helios.
Aerial photo of development of the Epic Universe show fountain.
Aerial photo of development of the Epic Universe show fountain.
Aerial photo of Celestial Park near Blue Dragon Pan-Asian Restaurant and Helios Grand Hotel.
Aerial photo of current work at Blue Dragon Pan-Asian restaurant in Epic Universe.
Aerial photo of Celestial Park near the portal to Dark Universe. Blue Dragon Pan-Asian restaurant at top right.
Aerial look at Celestial Park area construction between Constellation Carousel and the portal to Dark Universe.
Aerial look at development of a primary walkway in Epic Universe. Seen here between Oak & Star Tavern and some food and beverage kiosks in Celestial Park.
Aerial photo of food and beverage stands in development in Celestial Park. Concrete recently cast near the crane.
Door open. Door closed. Aerial photos at Dark Universe.