September 14, 2024 2:24 AM

Aerial look at current roof of the large dome at top of Helios Grand Hotel.

September 14, 2024 2:21 AM

Aerial photo of work in progress for the exterior of Helios Grand Hotel. As seen on the arrival side. In distance left and right is some of the skyline of the Harry Potter world in Epic Universe.

September 14, 2024 2:15 AM

Aerial overview of pool, road, and garden construction at Helios Grand Hotel.

September 14, 2024 2:14 AM

Aerial overview of pool, road, and garden construction at Helios Grand Hotel.

September 14, 2024 2:11 AM

Aerial overview of construction at the Helios Grand Hotel pool and outdoor recreation area. Dark Universe show building at top right.

September 14, 2024 2:09 AM

Aerial overview of the Helios Grand Hotel pool construction at Epic Universe.

September 14, 2024 2:06 AM

Aerial overview of the Helios Grand Hotel pool. Zoom in ... workers add scale. Cabana construction at top center. Zero depth entry at bottom left.

September 14, 2024 2:01 AM

Aerial photo of dome construction at the Helios Grand Hotel pool. The inner dome was recently placed. Zoom in, each beam of the structure is numbered 1-32. The outer dome is being assembled at ground level.

September 14, 2024 1:35 AM

Aerial look at landscaping in progress at the guest access road for Helios Grand Hotel. It crosses over the Epic Universe perimeter service road. County land on left of the fence. Universal land on right of the fence.

September 14, 2024 1:30 AM

Aerial overview of Terra Luna and Stella Nova resorts. Clearing at top right is recently started construction for a dual-branded EVEN and Staybridge Suites hotel. Strategically opening 2025.

September 14, 2024 1:22 AM

Aerial look at current landscaping of Kirkman Rd, between Terra Luna and Stella Nova resorts. The concrete lanes at center are exclusive bus lanes.

September 14, 2024 1:20 AM

Aerial photo of colorful pavement and development of guest parking at Stella Nova resort.

September 14, 2024 1:17 AM

Aerial photo of colorful pavement in Terra Luna resort.

September 14, 2024 1:14 AM

Aerial photo of current construction outside of Terra Luna resort. (Construction Team can be seen using the Porte-cochère as a break area with picnic tables.)

September 14, 2024 1:10 AM

Aerial photo of construction at the pool of Terra Luna resort.