Current work at the large dome on top of Helios Grand Hotel.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,810
- photos
- 21,336
- posts
- spanning
- November 2023 – August 2026
- latest
- August 4, 2026
Jump to a month
Show every monthHelios Grand Hotel rising above the tree line.
Helios Grand Hotel, inside Epic Universe.
Equipment being placed on the raised traffic circle near Epic Universe. Blocking view of Pegasus on top of Constellation Carousel. Equipment can be seen in the first Post of this Thread.
Aerial photo of a raised traffic circle in progress near Epic Universe. Kirkman Rd runs left-right. Epic Blvd top-bottom. The bottom direction leads to guest parking for the park. This raised circle eliminates left turns, improves traffic flow.
Aerial overview of roads near Epic Universe parking. Arrow at the toll plaza.
Aerial photo of current construction of the Epic Universe parking toll plaza.
A look at current construction of the Epic Universe parking toll plaza.
View of a berm or dirt bank near Destination Pwy. Seems like about half of the bank is being trucked away.
Photos of equipment removing dirt from a dirt bank at the Epic Universe site.
Aerial photo of a dirt bank or berm being lowered at the Epic Universe site.
Large display monitor recently added near the Universal lagoon.
Frames recently added at the new over water building at the Universal lagoon.
Theming continues at the Blumhouse Scare Zone for #HHN
Trusses up for entrance theming of #HHN Halloween Horror Nights.