View of construction at top of Helios Grand Hotel at night. A lounge will be under the dome. A ballroom at right.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
Jump to a month
Show every monthConstruction lighting allowing a peek in the Stella Nova lobby. Through protective plastic at the windows.
Stella Nova resort at twilight, with construction lighting in the lobby.
Terra Luna resort catching the glow of sunset. With star lighting on during testing.
Terra Luna resort at twilight. Star lighting being tested.
Terra Luna resort at twilight. Star lighting being tested.
A very wide photo of Terra Luna resort at twilight. Star lighting being tested. Composite of 4 photos.
Terra Luna resort at twilight as seen from Universal Blvd. Star lighting is being tested.
Star lighting being tested at Terra Luna resort.
Star lighting being tested at Terra Luna resort.
Star lighting being tested at Terra Luna resort.
Star lighting being tested at Terra Luna resort. A close look at the bend in the tower, on the Universal Blvd side.
Star lighting being tested at Terra Luna resort.
The large sphere at Mission: SPACE is in refurbishment.
A variety of panels at Mission: SPACE during refurbishment of a sphere in the exterior.