Current work at the Epic Universe preview center. Fence in foreground surrounding refurbishment of viewing area of the CityWalk waterfront stage.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
Jump to a month
Show every monthWaffles sign seen when Shrek isn't available at his Cottage for photos in DreamWorks Land.
Concrete block structure in progress on the new over water platform at the Universal lagoon.
Seems like more sign elements are pending at E.T. Adventure. There's connections on the frame near the bottom and at the moon for, perhaps, more trees.
At center is a themed door that is lowered when the Treasures of Poseidon shop is closed.
Maintenance in progress at Mythos. Refurbished rock work that will soon be painted.
Snow has drifted from Hogsmeade over to Mythos, forming snow caps.😉
A graphic outside Backwater Bar in Port of Entry.
DreamWorks Land preview sign up queue has a ride car progress bar.
It might be fun if @orlandoparkstop named the next Epic Universe analysis on YouTube as Mega Video. Latest Mega Update at https://www.youtube.com/watch?v=Qf8fOZkTDdM
Current facade at the summer Tribute Store. Themed as a store plaza with multiple shops.
Seems like the upcoming summer Tribute Store will have these three themed sections. Individual signs at the "plaza" exterior. Very entertaining to think about what could be available inside the arcade.
CityWalk waterfront stage viewing area is in refurbishment.
Barricade that replaced construction fence at DreamWorks Land.
Front of DreamWorks land. Bridge is part of Shrek's Swamp For Little Ogres.