the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,792
photos
21,321
posts
spanning
November 2023 – August 2026
latest
August 3, 2026

878 photos in May 2024

Clear all Grid Feed

Jump to a month

Show every month
May 19, 2024 10:28 PM

Photo ops at the front of DreamWorks Land.

May 19, 2024 10:24 PM

Landscaping between Shrek's cottage and E.T. Adventure. (Construction fence replaced with barricade.)

May 19, 2024 10:22 PM

A look at Shrek's Cottage in DreamWorks Land. (Construction fence replaced with barricade.)

May 19, 2024 4:29 PM

Green Chronos tower starting to rise and join the colorful Epic Universe skyline.

May 19, 2024 4:25 PM

Colorful reflective tiles wrapping around an end of the Terra Luna resort tower.

May 19, 2024 4:22 PM edited

Colorful reflective tiles wrapping around an end of the Terra Luna resort tower.

May 19, 2024 4:19 PM

Side view of the decorative element at top of Helios Grand Hotel. Spheres in the center also have details facing the lounge.

May 19, 2024 4:11 PM

Theming at top of Helios Grand Hotel in Epic Universe.

May 19, 2024 4:07 PM

Theming so far on top of Helios Grand Hotel in Epic Universe. Including a sphere with rings.

May 19, 2024 4:02 PM

A look at two of the domes at top of Helios Grand Hotel. A column has also been decorated with sphere and rings.

May 19, 2024 11:17 AM

Aerial photos of current work at the Daryl Carter Pwy interchange with I-4.

May 19, 2024 11:14 AM

Aerial photos of a recently spanned overpass ramp of Daryl Carter to I-4 EB. Overpass might be a long term plan for a long exit to Central Florida Pwy underneath.

May 19, 2024 11:10 AM

Aerial photo showing (at 1) where the I-4 WB ramp from Central Florida Pwy will overlap with exiting traffic to Daryl Carter Pwy. Overpass (at 2) might be a long term plan for a long I-4 EB exit to CFL Pwy. Project page: https://i4beyond.com/project-designs/segment-designs/i-4-at-daryl-carter-parkway-interim-interchange/

May 19, 2024 10:46 AM

Aerial photos of the Central Florida Pwy interchange with I-4.

May 19, 2024 10:44 AM

Aerial photo of the I-4 overpass at Central Florida Pwy.

Older → ↩ Back to the newest