the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,810
photos
21,336
posts
spanning
November 2023 – August 2026
latest
August 4, 2026

878 photos in May 2024

Clear all Grid Feed

Jump to a month

Show every month
May 5, 2024 3:21 AM

At left, current work for the Epic Universe preview center, seen at night.

May 5, 2024 3:15 AM

Lighting tonight in the Poppy's Playground area in DreamWorks Land.

May 5, 2024 3:11 AM

Lighting tonight in Shrek's Swamp for Little Ogres in DreamWorks Land.

May 5, 2024 3:09 AM

A grip went up with the lights on a boom lift. The grip adjusted lights as needed for a production tonight in Universal Studios Florida.

May 5, 2024 3:04 AM

A boom lift with lighting for production at Universal Studios Florida after park closing.

May 5, 2024 3:01 AM

Setting up for production at Universal Studios Florida after park closing.

May 5, 2024 2:58 AM

At top of this photo is the recently added Illumination at night in Minion land. Normally the letters are all lit. Then for second or two, every 15 minutes, they change to MIN ION.

May 5, 2024 2:54 AM

The recently added Illumination at night in Minion land. Normally the letters are all lit. Then for second or two, every 15 minutes, they change to MIN ION.

May 5, 2024 2:51 AM

The recently added Illumination at night in Minion land.

May 5, 2024 2:50 AM

The recently added Illumination at night in Minion land. Normally the letters are all lit. Then for second or two, every 15 minutes, they change to MIN ION.

May 4, 2024 11:27 PM

Landscaping in progress to block the monorail view of the circulation/filtration plant for Journey of Water.

May 4, 2024 11:25 PM

CommuniCore Plaza stage still a construction area. Note that the boom lift wheels are in fabric boots to prevent tire marks on the pavement. An Encanto show premieres here next month.

May 4, 2024 11:21 PM

Glimpse of a CommuniCore Hall entrance, as seen from monorail.

May 4, 2024 11:20 PM

Roof refurbishment in progress at the Stave Church in the Norway pavilion.

May 4, 2024 11:17 PM

Imagination pavilion vanishes, similar to a scene in the attraction, in this mirror glass view of EPCOT from the monorail.

Older → ↩ Back to the newest