Current work in CommuniCore Plaza.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
Jump to a month
Show every monthAerial photo of Epic Universe Apr 25, 2024 • Dragons in grandstands • The Burning Blade Tavern windmill has blades • Portal ring added to Super Nintendo World • Theming element at Helios Grand Hotel dome • Theater entry tent frame in Harry Potter land
Aerial overview of Epic Universe.
Apr 25 aerial photo of current work at the new interchange of Sand Lake Rd and Kirkman Rd. Kirkman is being extended alongside Epic Universe.
Aerial look at the new overpass of Sand Lake Rd at Kirkman Rd.
Aerial photo of raised traffic circle construction near Epic Universe.
In foreground of this aerial photo is construction of an electric bus depot near Epic Universe.
Aerial photo of Stella Nova resort. Base of the resort recently painted.
Aerial photo of pool construction at Terra Luna resort.
Aerial photo of colorful reflective tiles being installed on the arrival side of Terra Luna resort.
Aerial photo of completed installation of tiles on the pool side of Terra Luna resort.
Aerial look across all the water features in Celestial Park. From the Epic Universe portal at top left, to Helios Grand Hotel.
Aerial photo of the Epic Universe splash pad near the show fountain and a restaurant.
Aerial photo of a Celestial Park restaurant near The Wizarding World of Harry Potter - Ministry of Magic.
Aerial photos of landscaping, paths, and bridge features near Blue Dragon Pan-Asian Restaurant in Epic Universe.