Aerial look at development of Blue Dragon Pan-Asian Restaurant in Epic Universe. A cascading water feature flows in front, from right to left.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,771
- photos
- 21,306
- posts
- spanning
- November 2023 – August 2026
- latest
- August 2, 2026
Jump to a month
Show every monthAerial photo of Blue Dragon Pan-Asian Restaurant in Epic Universe.
Aerial look at some of Celestial Park in Epic Universe.
Aerial look at Celestial Park near the portal of Dark Universe. The circular building is CelesTiki bar.
Aerial photo of the Epic Universe show fountain and the portal of The Wizarding World of Harry Potter - Ministry of Magic.
Aerial photo of Celestial Park areas near the Epic Universe show fountain. A cascade of water will flow at the rock work into the basin.
Aerial photos with current work at the viewing area of the Epic Universe show fountain.
Aerial photo of the Epic Universe show fountain and Celestial Park areas at base of Helios Grand Hotel. At center, rock work is being painted at a cascade of water into the basin.
Aerial look at the chain of water features spanning Celestial Park in Epic Universe.
Aerial photo of a boom lift reaching down to the floor of a pond being painted. Next to Celestial Carousel.
Aerial photo of areas near Celestial Carousel.
Aerial photo of current painting of Celestial Carousel. A splash pad is in development top left.
Aerial photo of Celestial Park near Super Nintendo World.
Aerial look at a cross-park walkway in Epic Universe. Rock work in development on the left side of the bridge.
Aerial photo of a Super Nintendo World store and Pizza Moon under construction in Celestial Park.