Some areas Disney's Boardwalk Resort's boardwalk have been replaced.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,810
- photos
- 21,336
- posts
- spanning
- November 2023 – August 2026
- latest
- August 4, 2026
Jump to a month
Show every monthA floral Mickey further decorated by Mother Nature with nearby pink Tabebuia tree petals. In EPCOT.
Tabebuia trees adding pink petals to a floral Mickey in EPCOT.
A pavement pattern in EPCOT World Celebration, and Andy's shoe print pattern in Toy Story Land.
Surprising to see Disney 100th anniversary balloons are still available.
Aerial photo of Epic Universe Feb 28, 2024 • Dark Universe portal ring installed • Yoshi cars uncovered for nightly test • Donkey Kong wall has palm tree • Grandstand framing rising for How To Train Your Dragon coaster. • Glimpse of Dragon coaster uncovered train first car
Aerial overview of Epic Universe.
At top left of this aerial photo is Epic Universe day guest parking. Currently in use by construction workers. The section left center (with construction staging) will eventually be paved. Construction staging top right might become overflow parking.
Aerial photo of Helios Grand Hotel. The in-park Epic Universe resort.
Aerial look at the redo of Sand Lake Rd at Kirkman Rd, as an Epic Universe traffic improvement.
Aerial photo of landscaping in progress along Kirkman Rd, at the Helios Grand Hotel's access road.
Aerial photo of the 3 Epic Universe area resorts. Helios Grand Hotel in foreground, with resort's pool at right. Stella Nova and Terra Luna at top center and top right.
Aerial overview of Epic Universe. Day guest parking in top right.
Aerial look at raised traffic circle construction. To ease the flow of Epic Universe day guest parking.
Aerial overview of Celestial Park in Epic Universe.