Aerial look at colorful patterned pavement in progress outside the portal of the Harry Potter land in Epic Universe.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
Jump to a month
Show every monthAerial photo of the portal of the Harry Potter land in Epic Universe.
Ducks asleep on one of the new fountain arrays in the Universal lagoon.
Current work at Shrek's house in DreamWorks land. Grasses were added today.
CityWalk Birthday Celebration for Bob Marley next week.
Aerial overview of Helios Grand resort in Epic Universe.
Aerial photo of the arrival side of Helios Grand in-park resort at Epic Universe.
Aerial overview of work on the Helios Grand resort pool area.
Aerial photo of construction of the Helios Grand pool bar.
Aerial photo of development between Helios Grand in-park resort and the Epic Universe show fountain. Frame for a bridge has been placed at top of a cascading water feature.
Aerial look at the overlook under construction at the base of Helios Grand in-park resort of Epic Universe. A bridge frame has been placed at left over the top of a cascading water feature.
Aerial photo of Helios Grand in-park resort at Epic Universe.
Aerial look at construction on top of Helios Grand in-park resort of Epic Universe.
Aerial look at dome construction on top of Helios Grand in-park resort of Epic Universe. First two sections of steel frame placed.
Aerial look at construction of a dome at top of Helios Grand in-park resort at Epic Universe. First two sections of steel frame placed. Inside is scaffolding for building the dome interior.