Yellow truss at center of this aerial photo is being assembled to support construction of a dome at top of the Epic Universe in-park resort tower.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
Jump to a month
Show every monthAerial look at framing for a curved roof edge over a ballroom at top of the Epic Universe in-park resort tower.
Aerial overview of the Epic Universe in-park resort.
Aerial look at the front of the Epic Universe in-park resort tower.
Aerial photo of a restaurant at base of the Epic Universe in-park resort tower. A cascading water feature is in front, and a bridge is in progress. Top of the Dark Universe portal tower also seen.
Aerial photo of the development of the lower floors of the Epic Universe in-park resort tower. Yellow layer is waterproofing. A concrete pour is pending.
Aerial photo of workers completing installation of colorful reflective tiles on the South side of Stella Nova resort.
Aerial overview of How To Train Your Dragon land and surrounding areas of Epic Universe.
Aerial photo of the Meade Hall area of How To Train Your Dragon land.
Aerial photo of the Meade Hall area of How To Train Your Dragon land.
Aerial overview of rock work in progress at Meade Hall in How To Train Your Dragon land. A substantial excavation at the bridge at left.
Scaffolding being added to sculpt rock work on top of Meade Hall.
Aerial photo of rock work at the entrance to Meade Hall. Viking statue shapes are on both sides of the door. In How To Train Your Dragon land.
Aerial photo of the target-practice boat ride in How To Train Your Dragon land. Roof recently raised over the station.
Aerial photo of part of How To Train Your Dragon land.