Seems like a U-Turn arrow ↷ would be better on this signage just outside the EPCOT Breezeway.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,792
- photos
- 21,321
- posts
- spanning
- November 2023 – August 2026
- latest
- August 3, 2026
Jump to a month
Show every monthFirst change out of the lower gardens in the center of World Celebration. Second photo Dec 9, 2023.
Mildew cleaning in progress at the CommuniCore restrooms.
The longtime construction bypass near the Seas pavilion has closed.
All of the types of Mold-a-matic figures and their color variations offered at the Universal Legacy Store in CityWalk. The store is currently in a re-do.
The Universal Legacy Store is in a redo in CityWalk. Arrow where the letter E of the sign has collapsed inward.
One of a few faded photos near the front of Universal Studios Florida.
Paint weathering and a quick repair where temporary Tribute Store facades were standing near a park store exterior for several months.
Some of the rockwork along the shore of the Universal Lagoon is water damaged. Water level lowered during construction of the new nighttime show.
Base of the sculpture of Shrek's house seems to be as mud, or moist land. A swamp.
Refinements at the top of the sculpture of Shrek's house in DreamWorks land.
Arrow at steel frame up for a new Back of House building of Universal Studios Florida. Team Member Campus Commons. Just past the tracks of Hogwarts Express.
Osprey nesting season begins across the street from Islands of Adventure.
Reverse view of the launch of The Incredible Hulk.
A look at the new show platform in the Universal lagoon. It was assembled several weeks ago, then submerged during the holiday season. Show installation now in progress.