the BERM record Walt Disney World Map Archive
From above

The aerial archive

A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.

25,771
photos
21,306
posts
spanning
November 2023 – August 2026
latest
August 2, 2026

392 photos in November 2023

Clear all Grid Feed

Jump to a month

Show every month
November 26, 2023 5:11 PM

Very wide aerial photo at some of the lodging of Universal Orlando Resort.

November 26, 2023 5:07 PM

Aerial photo of Sapphire Falls.

November 26, 2023 5:05 PM

Aerial photo of Aventura Hotel.

November 26, 2023 5:03 PM

Aerial photo of Hard Rock Hotel at Universal Orlando.

November 26, 2023 4:57 PM

Aerial photo where Kirkman road crosses over private Lockheed Martin roads. Epic Universe out of frame, at left.

November 26, 2023 4:55 PM

Aerial look at current work on the Sand Lake Rd/Kirkman Rd interchange. Overpass at top center is for access of the private roads at Lockheed Martin.

November 26, 2023 4:52 PM

Aerial overview of work on the new Sand Lake Rd overpass of Kirkman Rd. Kirkman, at left, leads to Epic Universe.

November 26, 2023 3:08 PM

Aerial photo of work on a raised traffic circle near Epic Universe. Over Kirkman Rd. Circle to improve traffic flow for day guest parking, at right.

November 26, 2023 3:04 PM

Aerial overview of work on a raised traffic circle near Epic Universe. Intersection of Kirkman Rd and Epic Blvd (day guest parking access road). Arrow at access of Stella Nova resort.

November 26, 2023 2:53 PM

Aerial photo of pool construction at Terra Luna resort. South of Epic Universe.

November 26, 2023 2:51 PM

Aerial photo of pool construction at Stella Nova resort. South of Epic Universe.

November 26, 2023 2:49 PM

Aerial photo of pool construction at Stella Nova resort. South of Epic Universe.

November 26, 2023 2:47 PM

Aerial look at the pool side of Stella Nova resort. Steel and roof recently raised at a small building. Colorful reflective tile is wrapping around at left to join the first tiles placed.

November 26, 2023 2:43 PM

Aerial look at development of guest parking and roads fronting Stella Nova resort. South of Epic Universe.

November 26, 2023 2:40 PM

Aerial look at work on Stella Nova resort. Colorful reflective tile at left will temporarily stop when it reaches the construction elevators. Tile at the right is wrapping around the building. Parking and other ground level features are taking shape. South of Epic Universe.

Older → ↩ Back to the newest