June 13, 2026
7:47 PM
Aerial photo of construction of Fast & Furious Hollywood Drift.
It's likely that the CityWalk walkways will be redone here. Temporary concrete along the waterfront to be replaced, wider. Parallel route restored (under The Spike tower).