September 22, 2025
1:04 AM
A nearly straight-down Sep 20 aerial photo of the I-4 WB ramp to SR 528 Beachline EB. Ramp is being widened to two lanes, work is completing on the left side of the overpass.
A nearly straight-down Sep 20 aerial photo of the I-4 WB ramp to SR 528 Beachline EB. Ramp is being widened to two lanes, work is completing on the left side of the overpass.