the BERM record Walt Disney World Map Archive
August 26, 2025 1:44 AM

Part of the demolition process at Hollywood Rip Ride Rockit includes making rectangular openings in the track beams.
• Photo 1 has steel hanging at the firehouse curve.
• Photos 2 & 3 show the process as seen in the Treble Clef track yesterday morning (Aug 24).

3845×2157 Aerial Finishing
2258×1270 Aerial Structure
2258×1270 Aerial Finishing

View original on Mastodon