September 15, 2024
11:47 AM
Aerial look at beams recently placed at the Sand Lake Rd interchange with I-4.
• The 5 beams in foreground are for a cloverleaf ramp to replace left turn Sand Lake WB to Turkey Lake SB.
• Other beams for the new I-4 WB overpass.
📸Sep 12