February 4, 2024
9:24 PM
Aerial photo of current work at the Sand Lake Rd WB ramp to I-4 WB. This flow eventually becomes part of a diverging diamond, with left turn where barricades are in top right.
Redo of this ramp eventually replaces the left turn of Sand Lake WB to Turkey Lake Rd SB.